Construction Problem
Construction failure in the new City Hall Repairs completed at Surprise parking structure
I read the entire article, the problem was I did not understand exactly what was said, why would Surprise hire a third-party structural engineer from PK Associates to investigate the cause of the drop, at a cost of $2,500. The General Contractor D.L. Withers should of been called right away..Period
“(D.L.Withers) fixed the issue,” Oliver said. “We didn’t suffer damages, all’s taken care of. D.L.Withers did as any good contractor would do and addressed the issue.” It was a construction problem not an issue.
If it was a design failure, we could have more problems, it appears they doubled up from the plans on the connections that they installed, does not sound good, if this actually happened.