2004/2005 cost to repair Bell Rd
Memorandum from Dr. Maki to Jim Rumpeltes
BELL ROAD SURFACE
Earlier this fiscal year a specialist in pavement preservation recommended application of a 5/8″ thick rubberized microsurface after any needed crack sealing and rut filling. This work requires closing only one lane at a time. Estimated cost for the nine miles from Avenue of the Arts to the Beardsly Canal is $1.8 million including cover adjustments, traffic control and pavement markings. The project is in PW 2004-2005 CIP but may be split into two years.
Because this was not done then, what is it going to cost us now?